It is possible to enable or disable the “Allow the network to charge the batteries” function by connecting to the inverter via the IMEON OS. ONE software. Go to the “Flow Management” tab and check the “yes” or “no” box of the “Allow the network to charge the batteries” setting. Finally, enter the time range of the parameter “charging batteries through the authorized network of” for which the public network will charge the batteries.